PROJECTS
Kinali Tekirdag Divided Highways
-
1,625,000 m³ earthworks
-
39,100 m³ reinforced concrete structure
-
1,300,000 tons base
-
865,000 tons asphalt pavement work
Izmit - Sakarya Collection Roads
Reformation road performance deteriorated due to construction work between the Izmit - Sakarya highway collection road Km: 100-125 and highways (between km: 100-182)
-
1,894,000 m³ earthworks
-
27,400 m³ reinforced concrete structure
-
1,125,000 tons base
-
550,000 tons asphalt pavement work
Anatolia Highway (Kazanci-Gumusova part)
-
1,784,000 m³ earthworks
-
28,400 m³ reinforced concrete structure
Hisarustu - Catalca - Camlica – Samandira
Infrastructure works in parts of Hisarustu - Catalca - Camlica – Samandira
-
1,210,000 m³ earthworks
-
17,000 m³ reinforced concrete structure
Construction of Kinali - Sakarya Highway (including the 2nd Bosphorus Bridge)
-
2,350,000 m³ earthworks
-
39,100 m³ reinforced concrete structure
Infrastructure Works in Istanbul Camlica toll booths
-
925,000 m³ earthworks
-
28,500 m³ reinforced concrete structure